Stainless Steel Non Stick Portable Automatic Leaf Shaps Electric Waffle Cone Maker

US$129.00 10 Pieces (MOQ)
Port:
Guangzhou, China
Payment Terms:
T/T, Western Union, Paypal, Money Gram

Last Login Date:

Nov 11, 2021

Business Type:

Manufacturer/Factory, Trading Company

Main Products:

Coffee Maker, Coffee Grinder, Western Kitchen Equipment, Planetary Mixer&Food Mixer, Electric or Chicken Rotisseries

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
BA-51
Power Source
Electric
Condition
New
Voltage
220-240V
Power
1.6kw
Size
300*380*270mm
Certification
Ce
Material
Stainless Steel
Application
Restaurant
Place of Origin
Guangdong, China (Mainland)
Packaging Details
Carton+Foam
Product Name
Waffle Machine

Product Description

Product Details:
1.Good packing send to all over the world.
2.stainless steel in outline border; Heavy duty top plate.
3.The Commercial Waffle Toaster is designed for baking waffle with independent 

   heat control and cast iron molds .
4.The baking molds are made of high grade cast iro with high thermal coductivity.
5.This product is very suitable to bake food in the shop/fields and to provide hot food to the
   customer and the operation is very easy.
6.The highly conductive cast iron plate spread heat evenly,on/off switch,thermostat                    0~300ºC,
pilot lights.
7.With non-stick grids.
8.5-minute timer with audible "ding"
9.Adjustable thermostat.

 
ModelVoltagePower(Kw)Size(mm)
BA-51220-240V1.5310*440*235
BS-31220-240V1.5380*270*235
EG-30220-240V1.4225*420*290


 
FAQ:
Q1: I am interested in your products, how can I know more about them?
A: You can leave a message to us, or send the email to our sales person, kindly contact us;
Q2: I want to buy your products, how can I pay?
A : You can pay via T/T , L/C , WEST UNION , MONEYGRAM
Q3: How's the Warranty of your Products?
A : 1 year warranty, if there were quality issue confirm by us in one year after the invoice date, then we will provide the spareparts free, but customer pay the international freight cost; if out of one year , customer will also need pay for the spareparts;
Q4: How long of  the production lead time?
A : Normally 30~35 days after receive deposit for the container order; 40 days in Production Peak Season; Sample lead time usually in 7~10 working days. But the accurate date plz kindly ask our sales person.
Send your message to this supplier
Miss Lvyliang

Post a Sourcing Request Now

People who liked this also liked